Synopsis

You were just a normal art student with dreams of making it in the city. How is it that you're in a concert one night and back to a week ago in a flash? Could the mysterious disappearances and power surges have something to do with this? You obviously have to find a way to stop this. Hopefully, one of these five people you've been seeing all week can help you figure it out before you find yourself lost in time forever. 

Falling in love with them wasn't part of the plan though.

Features

demo

  • Roughly 20k words in the demo
  • A week of gameplay/full prologue + glimpse of the time loop/common route
  • Name your MC
  • Meet 5 unique love interests
  • As a journal junkie, dive into your weekly schedule and entries anytime
  • Interactive choices
  • Original music, dynamic sound

note: artists still actively working on the art so a lot of the backgrounds and CGs are still rough placeholders/not added yet, Dr. Cailan sprite also to be added later.

full game (in dev)

  • 8 looping weeks of gameplay (prologue, common route, 5 LI routes, finale route)
  • Multiple endings (good and bad ending for each LI) driven by your choices
  • Fully investigate the concert disaster/time-loop mystery

Characters

Credits

Parallel Lines by De Quatro

Pexels and Canva (for placeholders)

Team

Art: Blob, Fox.net

Sound Design/Music: Comet

Writing/Programming: Ranger, elljana

Download

Download
ALoopApart-1.1-pc.zip 410 MB
Download
ALoopApart-1.1-mac.zip 405 MB

Comments

Log in with itch.io to leave a comment.

I really like Lay. He's so sweet and cute!